nextstopTORONTO LAB
← Back to the campaign
Scenario & layers
TORONTO / SCENARIO ATLAS

A balanced network.

Generated alternatives, grounded in context.

EXPLORATORY CONCEPT Not an official transit plan
Construction estimate—Illustrative range · CAD
Improved corridors—Select your priorities to begin
Annual operations—Illustrative annual estimate
CONNECTION NOTES

Start with the connections.

Explore how different corridors could make Toronto easier to cross.

Existing TTC rail Proposed corridor Concept stop
THE REGION MOVES TOGETHER

Trips cross city limits.

Explore the 2022 Transportation Tomorrow Survey’s regional travel patterns. These estimates describe trips by GTHA households with both ends inside the Greater Toronto and Hamilton Area.

Loading the travel survey…

Source: 2022 TTS, collected in fall 2022 and spring 2023; people age 5 and older, including the survey’s expanded walking-trip coverage. Values are rounded survey estimates. Trips involving places or households outside the GTHA are excluded. We calculate view totals from rounded cells, so they may differ slightly from published totals. Earlier survey cycles use different definitions.

Read the original tables and methods ↗
A DIFFERENT WAY TO GET THERE

Same corridor. Different choices.

Compare transit modes for your selected connection. These are illustrative scenarios under the same service assumptions.

A LITTLE CONTEXT GOES A LONG WAY

Imagination, with the workings shown.

Nextstop is an experimental transit sandbox. It uses an explainable scenario model to choose up to three upgrades from six Toronto bus corridors. Change the assumptions and explore a different result.

01

Start with real streets.

The baseline uses actual TTC route and stop geometry, including Lines 5 and 6, from the August 27, 2026 data snapshot. Proposals follow portions of those bus corridors.

02

Compare possibilities.

The model compares bus priority, BRT, light rail and underground metro against construction and operating budgets. It can recommend no new construction.

03

Understand the tradeoff.

More stops mean shorter walks but slower journeys. Higher frequency requires more vehicles. Metro can be faster, with a much larger construction bill.

What this first version can tell you

Routes and existing stop locations are sourced. Costs, speeds and ranking weights are explicit design assumptions, not calibrated predictions. The model is rule-based; no live language model is connected. Population density now uses Toronto’s 2021 neighbourhood census profiles. It is historical context, not a demand forecast. A separate explorer shows published regional origin–destination totals, without assigning them to proposed routes. Toronto ravine and environmentally significant area boundaries add an initial environmental screen. Ground profiles use sampled polygon averages from Toronto’s 2023 terrain data. Corridor-level demand, geology and full journey routing are not yet integrated. No ridership, traffic reduction or financial feasibility is claimed.

The details that matter

See the cost and speed assumptions
ModeGuideway / kmEach stopMoving speed
Bus priorityC$2–7mC$0.08–0.3m23 km/h
BRTC$9–24mC$0.4–1.2m32 km/h
LRTC$80–180mC$4–12m40 km/h
MetroC$280–550mC$80–160m60 km/h

Illustrative 2026 Canadian-dollar assumptions, not agency estimates or validated local benchmarks. Depot/fleet allowances and a complexity factor are added. Operating estimates assume 18 hours per day, 365 days per year.

Ideas travel. Evidence comes with them.

Contains information licensed under the Open Government Licence – Toronto and the Open Government Licence – Ontario, and the Open Government Licence – Canada. Independent project, not affiliated with or endorsed by TTC, Metrolinx, Ontario or the City of Toronto. Census inputs adapted from Statistics Canada, Census of Population, 2021; this does not constitute endorsement by Statistics Canada. Map data © OpenStreetMap contributors; basemap © CARTO.